The subject of the advertisement
was the mechanical engineering for the two pumping plants
Gersweiler and Fenne. Both are components of the sewage
system Voelklingen.
|
| 0 |
 |
| 0 |
|
|
| 0 |
 |
|
| O |
|
|
| The pumping plant Fenne possesses two supplies:
Over a Saardueker already manufactured (protective
pipe DN 500 from concrete with medium pipe on the
inside DN 250 from duktilem casting; the subject
of this advertisement was not) flows the Dirt more
water from the quarters Luisenthal and old person
boiler the pumping plant lying on the right of the
Saar. The second supply is made by the pilot channel
103 (concrete pipe DN 2400, likewise not the subject
of this advertisement). Over the pilot channel the
waste water quantities of the attached and quarters
lying on the left of the Saar arrive at the pumping
plant. For both supplies own pumpensuempfe were
intended. The sump for the group of pumps of Luisenthal/old
person boilers "from the HS 4,0 is approx.
to 5m under the sump of the group of Fenne. The
pumps were set up in the building drying. |
|
|
|