|
|
|
|
|
|
DÜSSELDORF
GERSWEILER
FENNE
0
In the north park Duesseldorf, in the quarter Stockum lies beside the Aqua zoo the here eschriebene well plant. The well was established in the 30's. A restoration of the plant was now necessary. The well plant sits down from the fontaene been on higher level in the center of the park (upper well plant), which semicircular head basins with its three water stages and finally that 160 m long and 16 m broad long basins also on each page ten semicircular basin projection (lower well plant). Arc-shaped water jets from both sides form a long water tunnel.
Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700
0
From the remarks specified above now in the following described work became necessary. The technology in the eastern pumpenraum, which supplies the lower well plant, was completely dismantled and was disposed. The pumps were renewed and the pipe system inclusive center for the lower well plant again, made of high-grade steel were manufactured. Executions in the well basin were selected in close coordination with the reorganization of the basin and are contained in the range TGA. The lines within the basin to be dismantled, stored temporarily and after reorganization of the basin again brought in, since these became implemented already in high-grade steel waren.Im apron for this in both well basins the nozzles accurately measure, thus after completion of the overall renovation the same optical picture of the fontaenen be ensured could. In contrast to the lower well could be used the pumps in the western pumpenraum and in high-grade steel already implemented the pipings upper wells again. The pipings in the center, not installed yet in high-grade steel, and the lines in the well basin were disposed and implemented in high-grade steel. The controlling of the entire well technology was realized by the trade electrical. For this logic modules were used, which head for freely parametrierbar the individual pumps over relays and line contactors. Both the structure of the distributions, the installation and programming of the logic modules belonged to the capacity of the trade Elktro. To the ventilation flushing and for dehumidifying the technique areas a fan with duct system and pertinent control engineering was installed. A goal was to be prevented it by steered air agitation a drying process of the areas too received and thus to mould and corrosion.
Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700 Telefon: 02 14 30 20 700
Telefon: 02 14 30 20 700
Upper well plant
The upper well plant consists of two concentrically into one another with different Hfhe arranged, round a'berlaufbecken, in a square basin with rounded off corner areas stands. The two round basins feed the square basin
Telefon: 02 14 30 20 700
0
Lower well plant the lower well plant consists of an almost semicircular basin, overflow cascades and one approx.. 160 m x 16 m long basins with twenty in pairs arranged konchen.
Cellar area Underneath the well basins cellar area, in those the electrical operating seams, lies which pumping and the equipment technology are installed. The entire underground part of the well plant is opened by a round entrance in the brick wall specified before. With the underground buildings there are two ranges. The western range with vie areas under the upper well range, and the eastern range with three areas under the semicircular basin of the lower well range. Courses connect the two ranges with the entrance. Under way between the western and the eastern cellar areas there is one ontageschacht, which is covered by a soil-same construction with the and stone lying here in the upper place range. The assembly pit leads to the course, which connects the two parts of the well plant. At the western end of the course, directly before the upper well plant, is a light pit, which is covered with glass components. When assembly assembling and the light pit moisture penetrations and plant vegetation were to be determined. The room climate in the basement area was characterized by a very high air humidity and a relatively low Temparaturen. In some places water condensed and formed drops. Humidity occurred particularly by the leaky pits (light and assembly pit). A ventilation was only ensured by smaller joints and cracks e.g. with the eingangstuer. A ventilation system was missing. The underground areas were drained over one lower at the eastern end of the course in the input area of the there areas. The entire course along a gutter was trained in the soil, which lowers resulting water supplied.
0
c 2007 guerohrtec.com
_Deutsch_
_Englisch_
_Türkce_
_Dutch_
_French_
_Italian_